24 MW Biomass Power Plant – STACYVILLE, MAINE USA

• Amtek L.P. Heat Exchanger
• Amtek H.P. Heat Exchanger
• Grinnell Turbine Extraction
• G.E. & U.S. Motors Sootblowers
• WAPC-Canada Ridgid Precipitator
• Thomas Conveyor/Lane Supply Hopper Augers
• FMC Vibrators, Hopper
• Consolidated Safety Relief Valves
• Consolidated Turbine Extraction Valves
• General Electric Main Transformer
• Westinghouse Precipitator
• Westinghouse 3-Phase Boiler
• Land Instruments, Dynatron & Ametek Computerizes Monitoring Systems
• Zurn Industries MAIN BOILER
• Cleaver Brooks AUXILARY BOILER
• Atlantic Gulf Stack: 8′ I.S. Dia. X 160′ high
• Powex System Water Treatment
• Quantek Oil/Water Seperator
• Philadelphia Waste Tank Agitator
• Philadelphia Rinse Tank Agitator
• Peerless Truck Dumpers
• General Kinematics Destoner
• Atlantic Gulf Hog O.F. I Conv.
• Industrial Services Inside Storage Reclaimer
• Dresser Turbodyne Main Steam Turbine
• Delaval Lube Oil System
• Dresser Emergency Lube Pump
• Bently Nevada Vibration Monitoring System
• Electric Machine/DresserBrushless Main Generator
• Trane HVAC Systems
• Main Air Cooled-#2,#3, #4 GEA P.O. 1953-01688
• Main Air Cooled – #1 (Deflagmeter) GEA P.O. 1953-01688
• Kinema Steam Jet Air Ejector
• Baltimore Aircoil Cooling Tower
• Cataract Steel Indust. Gland Seal-Turbine
• Zurn Industries Pressure Vessels
• Feedwater, Clearwell, Decant Caustic Tank, HCL,
Neutralization Waste Water, Concentrated Waste
Water, Rinse Water, Cooling Water, Oil Storage, Reuse
Water, Hot Well & Process Condensate Tanks
Complete Biomass Power & All Equipment

CHOREN Biomass Gasification Plant
FREIBERG GERMANY

• Aggretech/MTU 1400 Emergency Generator
• V340 Emergence Generator
• Aerzen / Siemens Geafol Transformers
• Switchgear: low and medium voltage
• Elektrotechnik / Automatisierung
• Kaeser CSD 102T BSD72T
• Diesel Fire Pump, FH-AD 1086-07
• KSB Pumps, Etanorm MX 150-400
• Holzhauer Pressure Maintenance Pump, FH-VJ-2-25/12
• Wastewater System, Gutling / LED Italia TC 60,000
• Cold Water Systems
• Chiller Grasso FX PP 2X350 Duo
• Heat Exchangers
• Cooling Towers
• Fan Coolers
• (4) Nitrogen Compressors, VPT 55-14 RS C
• Bauer GIB15.3 Nitrogen Compressor w/Storage Battery
• Hydrogen Diaphragm Compressor, MKZ 630-10/280-40 Hofer
• Thermal gas Disposal Flare System
• 3-Stage Steam Turbine Generator
• Tank Farm: (5) Storage Tanks w/100 Cubic Meters, 500 m
• 3 Flat Bottom Tank

Choren’s Beta Gasification Technology was used in sustanableCO2 neutral fuel production from organic feedstock.  Decomissioned in 2011 the plant and equipment, much of which is less than 2 years old, was never installed and is brand new, and will be liquidated and sold at a deep discount.

Some Equipment Never Installed – Huge Quantity of Newer Equipment

For additional information call Burdette Wilber 314-616-8422 or Eric J Spirtas 314-780-3742

www.niagaraworldwide.com 

BORALEX/SHERMAN – LOCATION – STACYVILLE, MAINE USA

Niagara Worldwide is headquartered in Niagara, Wisconsin
and with the executive offices located in St Louis (Creve
Coeur), Missouri and Manalapan, New Jersey, Niagara
Worldwide is a nationally recognized, innovative firm.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

%d bloggers like this: